Project scheduling and management software for creating detailed project plans, Gantt charts, and resource allocation. Widely used in AEC for construction scheduling and progress tracking.
How teams use it
By audience
- Construction Management
- Builds CPM construction schedules with task dependencies, durations, and critical-path identification to drive the master program
- Develops resource-loaded Gantt charts to plan crews, equipment, and material deliveries against the timeline
- Sets and tracks baseline schedules, then measures actual progress and slippage against planned dates
- Manages milestone gates (permits, inspections, substantial completion) and float to keep the project on track
- Produces lookahead and progress reports for project controls and schedule-of-values coordination
- General Contracting
- Maintains the master project schedule and rolls up subcontractor activities into a single CPM network
- Coordinates trade sequencing and handoffs by linking predecessor/successor tasks across packages
- Runs what-if and delay analyses on the critical path to evaluate acceleration or recovery options
- Allocates labor and equipment resources, leveling overallocations across concurrent activities
- Tracks percent-complete and updates the schedule for owner and lender progress reporting
- Owner/Developer
- Reviews the contractor's baseline Gantt schedule and milestone dates to validate the delivery timeline
- Monitors progress against baseline to flag delays affecting occupancy, financing, or lease commitments
- Models phasing and milestone dependencies across multi-building or multi-phase developments
- Uses schedule data to align design, procurement, and construction milestones in the overall program
By phase
- Pre-Construction
- Builds the initial CPM baseline schedule and Gantt chart from the WBS during planning and bid
- Sequences design, permitting, procurement, and long-lead material activities with dependencies
- Defines milestones (NTP, mobilization, permit approvals) and float to set realistic completion dates
- Resource-loads the plan to forecast crew, equipment, and budget needs before mobilization
- Runs schedule scenarios to evaluate phasing options and constructability before construction starts
- Construction
- Updates actual start/finish and percent-complete against the baseline to track on-site progress
- Recalculates the critical path as field conditions change to identify and mitigate schedule slippage
- Generates weekly/three-week lookahead schedules to coordinate trades and deliveries
- Levels resources and reschedules to manage overallocations and concurrent activity conflicts
- Documents delays and produces progress reports for owner, lender, and claims support
Integrations (18)
| Integrates with | Connection | Details |
|---|---|---|
| NativeAutodesk Build Schedule tool import | ||
| NativeTwo-way MS Project import/export | ||
| NativeBuildots scheduling integration | ||
| NativeNative schedule import | ||
| NativeVantagepoint ↔ Microsoft Project | ||
| NativeFieldwire ↔ Microsoft Project connection | ||
| –Excel file export | ||
| NativeKrane native connector | ||
| iPaaSKroo data connector for Microsoft Project | ||
| NativeNavisworks TimeLiner data source (MS Project / MPX) | ||
| NativeSequence Data Integration connector (formerly EcoSys Connect) | ||
| NativeOpenSpace Track schedule import | ||
| NativeMicrosoft Project integration connection (XML import/export) | ||
| PartnerMSPDI XML schedule exchange | ||
| NativePremier native Microsoft Project integration | ||
| NativeProcore schedule .mpp import | ||
| NativeBuilt-in MS Project connector (PLANNER / SAFETY editions) | ||
| NativeSmartsheet MS Project import/export |
Only partners listed on AECi appear here. If one is missing, suggest a correction.
Reviews
No reviews yet — be the first to review this product.
Directory updates
Know when new tools and reviews land
AEC Integrations is live and still growing. Add your email for occasional updates as we expand the directory with new tools, integrations, and reviews.